Listed Buildings and Monuments are our Culture and are the most important part of our Cultural Heritage.
We have to protect and highlight them.
Our Culture is our Education.
1Preliminary report
The reasons for the intervention are presented.
2Documentation of the current situation
  • Design documentation - Imprinting the current situation.
  • Bibliography.
  • Photographic documentation.
  • Technical report describing the building / monument with emphasis on departments those in which the surgery will focus.
3Diagnosis
Diagnosis report, which presents the pathology of the building / monument and the causes of wear of parts of the material or materials.
4Dating of building phases.
  • Drawings - sketches showing the distinction of the building phases of the building / monument.
  • Composition - Architecture / Topography / Geotechnical / Static / EM Intervention proposal.
  • Technical report (description, justification, criticism of positive and negative interventions).
  • Plans of the proposal (topographical, floor plans, sections, views) Detail drawings.

1Αpproval
Once the Rehabilitation Study for the building / monument has been drawn up, it must be approved by multilateral committees of the Ministry of Culture or the Ministry of the Environment, Ministry of the Environment or other competent Ministries.
2License
After approvals by the relevant departments of each ministry, the study is submitted to the competent building authority for the final authorization. Any changes that occur during the repair should be submitted to the appropriate service for approval.

1Worksite Organization
Start of the construction site at the tax office, IKA, labor inspection, etc.
2Workshop Organization
Our crews are made up of specialized craftsmen, based on the needs, materials and styles that will be used on the basis of the study, in order to ensure an excellent final result.
3Definition of Security Measures for the whole project
Specific steps will be taken to ensure that the construction site is 100% safe for crews, engineers and any visitor in accordance with the Health and Safety Plan submitted and approved.
4Designate Engineering Supervisor and project tracking
The supervisor will be on site every day, supervising all work to ensure 100% or observance of the design, timing, construction and aesthetic result.